When Maltbys was contracted to build two additional carpark floors on top of the existing 6-level Downtown Carpark in Auckland, they chose the SPEEDFLOOR® Concrete Floor system.
This allowed them to undertake the project, which also involved seismic structural improvements to the existing carpark building and phased lift replacements, while the carpark remained operational.