{"data":{"items":{"data":[{"id":2,"type":"news_post","label":"SPEEDFLOOR\u00ae Contributes to Transportable Car Park System","attributes":{"id":2,"import_id":null,"image":null,"image_thumbnail":{"id":122,"parent_id":121,"name":"Park'd Group Perth.jpg","description":null,"storage":"assets","size":160692,"extension":"jpeg","mime_type":"image\/jpeg","width":1728,"height":976,"keywords":null,"usage":{"news_post_images.10":"EBOSS \u2013 Speedfloor Contributes to Transportable Car Park System","news_post_images.11":"EBOSS \u2013 Speedfloor Contributes to Transportable Car Park System","news_post_images.13":"EBOSS \u2013 Speedfloor Contributes to Transportable Car Park System","news_posts.2":"SPEEDFLOOR\u00ae Contributes to Transportable Car Park System"},"created_at":"2020-10-02 12:12:51","updated_at":"2023-10-19 12:10:40","link":"\/asset\/122.jpeg","readable_size":"156.93 kB","secured":false,"secured_token":"eyJ0eXAiOiJKV1QiLCJhbGciOiJIUzI1NiJ9.eyJzdG9yYWdlcyI6WyJzZWN1cmVfYXNzZXRzIl0sImZpbGUiOjEyMn0.6AQDXWlqz3vvLa5McXK0ZycUZ-Lt0OeX7_6-tc1pDWw"},"name":"SPEEDFLOOR\u00ae Contributes to Transportable Car Park System","title":"Speedfloor Contributes to Transportable Car Park System","author":null,"intro":"The SPEEDFLOOR\u00ae Transportable Concrete Floor System is a key component of PARKD\u2019s modular demountable car park, recently installed at City Subaru in Perth.","content":"<p>When City Subaru Victoria Park needed additional parking space, they looked for a solution that could be installed quickly to minimise disruption to business.<\/p>\n<p>The car dealership’s suburban Perth location left little room for expansion, and poor ground conditions meant a standard car parking system would involve time-consuming foundation work. They turned to PARKD for a modular demountable car park — a cost-efficient option that can be transported and reused in future.<\/p>\n<p>PARKD’s innovative modular transportable car park system was designed to enable fast, streamlined construction of car parks with minimal impact to the building structure. Prefabricated off-site, the system can be erected in a matter of days, saving significant time. The lightweight concrete system is built using three main components: precast columns, continuously voided beams and SPEEDFLOOR<span style=\"position: relative; font-size: 16.0284px; line-height: 0; vertical-align: baseline; top: -0.5em;\">®<\/span>Transportable Concrete Floor panels. <\/p>\n<p>“The SPEEDFLOOR<span style=\"position: relative; font-size: 16.0284px; line-height: 0; vertical-align: baseline; top: -0.5em;\">®<\/span> panels are an important part of the PARKD Car Park system as they offer a simple light weight solution for the slab structure.” says Peter McUtchen, Managing Director of PARKD.<\/p>\n<p>The SPEEDFLOOR<span style=\"position: relative; font-size: 16.0284px; line-height: 0; vertical-align: baseline; top: -0.5em;\">®<\/span> Transportable Concrete Floor System comprises a unique combination of cold-rolled steel sections and concrete to form a transportable concrete floor. All service holes can be pre-drilled, ensuring easy integration of services. <\/p>\n<p>In addition to its modular prefabricated construction, the system offers a number of qualities that make it the perfect fit for PARKD’s car park system. “It’s lightweight, it has good spanning ability and the surface finish is exceptional,” explains McUtchen.<\/p>\n<p>The installation of the PARKD car park system at City Subaru Victoria Park has been smooth and swift. “Within two weeks of completing the footings we reached substantial completion,” says McUtchen. The final result has met City Subaru’s brief and exceeded expectations.<\/p>\n<p>“We’re extremely happy with the efficiency of assembly and the resulting substantial feel to the car park, anything but temporary in nature” says McUtchen. “SPEEDFLOOR<span style=\"position: relative; font-size: 16.0284px; line-height: 0; vertical-align: baseline; top: -0.5em;\">®<\/span> Ltd are an important construction partner for PARKD and we look forward to applying this smart construction technology to our future projects.” <\/p>\n<p>For more information on the PARKD modular demountable car park system, <a href=\"http:\/\/www.parkdgroup.com\/\" target=\"_blank\" rel=\"noopener\">visit the PARKD website<\/a>.<\/p>\n<p>This project is also featured as an <a href=\"https:\/\/www.eboss.co.nz\/ebossnow\/speedfloor-ltd-transportable-concrete-floor-modular-car-park-system\" target=\"_blank\" rel=\"noopener\">EBOSS article<\/a><\/p>","name_id":"speedfloor-contributes-to-transportable-car-park-system","meta_description":null,"meta_keywords":null,"template":"default","position":25,"available_at":"2020-06-28 16:30:02","news_category_id":null,"file":null,"content_id":121,"path":"projects-stories\/speedfloor-contributes-to-transportable-car-park-system","news_post_id":20,"related_post_id":2,"categories":[{"id":11,"image":null,"name":"Projects","title":null,"intro":null,"content":null,"name_id":null,"meta_description":null,"meta_keywords":null,"position":9,"active":1,"created_at":"2020-09-18 14:04:10","updated_at":"2020-10-27 09:40:13","pivot":{"news_post_id":2,"news_category_id":11}},{"id":9,"image":null,"name":"Car Parks","title":null,"intro":null,"content":null,"name_id":null,"meta_description":null,"meta_keywords":null,"position":12,"active":1,"created_at":"2020-07-28 16:23:57","updated_at":"2020-09-18 14:04:44","pivot":{"news_post_id":2,"news_category_id":9}}]},"links":{"self":"https:\/\/www.speedfloor.co.nz\/news_post\/2","collection":"https:\/\/www.speedfloor.co.nz\/news_posts","panels":"https:\/\/www.speedfloor.co.nz\/news_post\/2\/panels","attached_panels":"https:\/\/www.speedfloor.co.nz\/news_post\/2\/attached_panels","related_posts":"https:\/\/www.speedfloor.co.nz\/news_post\/2\/related_posts","categories":"https:\/\/www.speedfloor.co.nz\/news_post\/2\/categories","images":"https:\/\/www.speedfloor.co.nz\/news_post\/2\/images"},"meta":{"preview":"\/resources\/speedfloor-contributes-to-transportable-car-park-system?preview","priority":"position","priority_order":"desc","active":1,"created_at":"2020-07-28 16:42:16","updated_at":"2023-10-19 12:10:40"},"included":[],"schema":{"collectionType":"news_posts","attributes":{"import_id":{"name":"import_id","type":"int","isRequired":false,"keyType":"","length":"11","default":null},"image":{"name":"image","type":"asset","isRequired":false,"keyType":"","length":"10","default":null,"extensions":["jpeg","jpg","png","svg"],"upload_dir":null,"upload_storage":null},"image_thumbnail":{"name":"image_thumbnail","type":"asset","isRequired":false,"keyType":"","length":"10","default":null,"extensions":["jpeg","jpg","png","svg"],"upload_dir":null,"upload_storage":null},"name":{"name":"name","type":"string","isRequired":true,"keyType":"","default":"","length":"255"},"title":{"name":"title","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"author":{"name":"author","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"intro":{"name":"intro","type":"text","isRequired":false,"keyType":"","default":null},"content":{"type":"text"},"name_id":{"name":"name_id","type":"slug","isRequired":false,"keyType":"","default":"","length":"251"},"meta_description":{"name":"meta_description","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"meta_keywords":{"name":"meta_keywords","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"template":{"name":"template","type":"enum","isRequired":true,"keyType":"","default":"default","length":"255","values":[{"id":"default","name":"default","config":[]}]},"position":{"name":"position","type":"int","isRequired":false,"keyType":"MUL","length":"10","default":null},"available_at":{"name":"available_at","type":"datetime","isRequired":false,"keyType":"","default":null},"news_category_id":{"name":"news_category_id","type":"int","isRequired":false,"keyType":"","length":"11","default":null},"file":{"name":"file","type":"asset","isRequired":false,"keyType":"","length":"11","default":null,"extensions":["pdf"],"upload_dir":null,"upload_storage":null},"path":{"name":"path","type":"string"}},"relationships":{"panels":{"type":"HasMany","class":"Panel","refs":"\/panels\/_ref_"},"attached_panels":{"type":"BelongsToMany","class":"AttachedPanel","refs":"\/attached_panels\/_ref_"},"related_posts":{"type":"BelongsToMany","class":"NewsPost"},"categories":{"type":"BelongsToMany","class":"NewsCategory","refs":"\/news_categories\/_ref_"},"images":{"type":"HasMany","class":"NewsPostimage"}}}},{"id":12,"type":"news_post","label":"Manukau Institute of Technology","attributes":{"id":12,"import_id":null,"image":null,"image_thumbnail":{"id":181,"parent_id":179,"name":"Manukau-Tech-1024x768.jpg","description":null,"storage":"assets","size":199882,"extension":"jpeg","mime_type":"image\/jpeg","width":1728,"height":976,"keywords":null,"usage":{"news_post_images.68":"Manukau Institute of Technology","news_posts.12":"Manukau Institute of Technology"},"created_at":"2020-10-05 12:15:41","updated_at":"2023-11-06 20:31:48","link":"\/asset\/181.jpeg","readable_size":"195.20 kB","secured":false,"secured_token":"eyJ0eXAiOiJKV1QiLCJhbGciOiJIUzI1NiJ9.eyJzdG9yYWdlcyI6WyJzZWN1cmVfYXNzZXRzIl0sImZpbGUiOjE4MX0.NFZ_b1LEf711KQ2htP6ojwz4jL9H6cvgaaAbmBqx48M"},"name":"Manukau Institute of Technology","title":"Manukau Institute of Technology","author":null,"intro":"This progressively built two-storey parking building at the Manukau Institute of Technology utilised SPEEDFLOOR\u00ae Suspended Concrete Flooring. Construction took place over two summer breaks, with the first level completed in just four weeks.","content":"<h5>Student Parking in Short Supply<\/h5>\n<p>With student parking in and around the South Auckland based Manukau Institute of Technology always in short supply, the board decided that a progressively built carpark was the only answer. They commissioned that a two-level carpark was to be built level by level over one of the existing ‘on-grade’ parking areas. The structural steel and SPEEDFLOOR® carpark were deemed the most cost-competitive structure.<\/p>\n<h5>Two-Level Carpark Constructed Over Two Summer Breaks<\/h5>\n<p>Part of the solution for the tertiary educational institute was to consider building during the summer break to limit the disruption to the students. The first level of over 1,400 square metres of SPEEDFLOOR® Suspended Concrete Flooring was erected and completed in four weeks over one summer break while the second level was erected and completed in the following year.<\/p>","name_id":"manukau-institute-of-technology","meta_description":null,"meta_keywords":null,"template":"default","position":14,"available_at":"2020-06-08 12:13:53","news_category_id":null,"file":null,"content_id":152,"path":"projects-stories\/manukau-institute-of-technology","news_post_id":20,"related_post_id":12,"categories":[{"id":11,"image":null,"name":"Projects","title":null,"intro":null,"content":null,"name_id":null,"meta_description":null,"meta_keywords":null,"position":9,"active":1,"created_at":"2020-09-18 14:04:10","updated_at":"2020-10-27 09:40:13","pivot":{"news_post_id":12,"news_category_id":11}},{"id":9,"image":null,"name":"Car Parks","title":null,"intro":null,"content":null,"name_id":null,"meta_description":null,"meta_keywords":null,"position":12,"active":1,"created_at":"2020-07-28 16:23:57","updated_at":"2020-09-18 14:04:44","pivot":{"news_post_id":12,"news_category_id":9}}]},"links":{"self":"https:\/\/www.speedfloor.co.nz\/news_post\/12","collection":"https:\/\/www.speedfloor.co.nz\/news_posts","panels":"https:\/\/www.speedfloor.co.nz\/news_post\/12\/panels","attached_panels":"https:\/\/www.speedfloor.co.nz\/news_post\/12\/attached_panels","related_posts":"https:\/\/www.speedfloor.co.nz\/news_post\/12\/related_posts","categories":"https:\/\/www.speedfloor.co.nz\/news_post\/12\/categories","images":"https:\/\/www.speedfloor.co.nz\/news_post\/12\/images"},"meta":{"preview":"\/resources\/manukau-institute-of-technology?preview","priority":"position","priority_order":"desc","active":1,"created_at":"2020-10-05 12:14:40","updated_at":"2023-11-06 20:31:48"},"included":[],"schema":{"collectionType":"news_posts","attributes":{"import_id":{"name":"import_id","type":"int","isRequired":false,"keyType":"","length":"11","default":null},"image":{"name":"image","type":"asset","isRequired":false,"keyType":"","length":"10","default":null,"extensions":["jpeg","jpg","png","svg"],"upload_dir":null,"upload_storage":null},"image_thumbnail":{"name":"image_thumbnail","type":"asset","isRequired":false,"keyType":"","length":"10","default":null,"extensions":["jpeg","jpg","png","svg"],"upload_dir":null,"upload_storage":null},"name":{"name":"name","type":"string","isRequired":true,"keyType":"","default":"","length":"255"},"title":{"name":"title","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"author":{"name":"author","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"intro":{"name":"intro","type":"text","isRequired":false,"keyType":"","default":null},"content":{"type":"text"},"name_id":{"name":"name_id","type":"slug","isRequired":false,"keyType":"","default":"","length":"251"},"meta_description":{"name":"meta_description","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"meta_keywords":{"name":"meta_keywords","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"template":{"name":"template","type":"enum","isRequired":true,"keyType":"","default":"default","length":"255","values":[{"id":"default","name":"default","config":[]}]},"position":{"name":"position","type":"int","isRequired":false,"keyType":"MUL","length":"10","default":null},"available_at":{"name":"available_at","type":"datetime","isRequired":false,"keyType":"","default":null},"news_category_id":{"name":"news_category_id","type":"int","isRequired":false,"keyType":"","length":"11","default":null},"file":{"name":"file","type":"asset","isRequired":false,"keyType":"","length":"11","default":null,"extensions":["pdf"],"upload_dir":null,"upload_storage":null},"path":{"name":"path","type":"string"}},"relationships":{"panels":{"type":"HasMany","class":"Panel","refs":"\/panels\/_ref_"},"attached_panels":{"type":"BelongsToMany","class":"AttachedPanel","refs":"\/attached_panels\/_ref_"},"related_posts":{"type":"BelongsToMany","class":"NewsPost"},"categories":{"type":"BelongsToMany","class":"NewsCategory","refs":"\/news_categories\/_ref_"},"images":{"type":"HasMany","class":"NewsPostimage"}}}},{"id":19,"type":"news_post","label":"Victoria Street Carpark","attributes":{"id":19,"import_id":null,"image":null,"image_thumbnail":{"id":262,"parent_id":261,"name":"Victoria-St-Carpark_2 copy.jpg","description":null,"storage":"assets","size":202570,"extension":"jpeg","mime_type":"image\/jpeg","width":1728,"height":976,"keywords":null,"usage":{"news_post_images.103":"Victoria Street Carpark","news_posts.19":"Victoria Street Carpark"},"created_at":"2020-10-16 09:57:18","updated_at":"2023-10-19 12:27:58","link":"\/asset\/262.jpeg","readable_size":"197.82 kB","secured":false,"secured_token":"eyJ0eXAiOiJKV1QiLCJhbGciOiJIUzI1NiJ9.eyJzdG9yYWdlcyI6WyJzZWN1cmVfYXNzZXRzIl0sImZpbGUiOjI2Mn0.Jfk91np-avwqn0cC4JjgJNRyPEWPlNhwCI0kEY3rGuc"},"name":"Victoria Street Carpark","title":"Victoria Street Carpark","author":null,"intro":"Four new levels were added on to the Victoria Street Carpark by contractor Dominion Constructors.","content":"<p>The extension included structural steel and SPEEDFLOOR<span style=\"position: relative; font-size: 16.0284px; line-height: 0; vertical-align: baseline; top: -0.5em;\">®<\/span> Suspended Concrete Flooring. The construction was accomplished while the rest of the carpark continued to operate as normal.<\/p>\n<p><a href=\"https:\/\/www.constructors.co.nz\/victoria-st-carpark\/\" target=\"_blank\" rel=\"noopener\">View the Dominion Constructors Project<\/a><\/p>","name_id":"victoria-street-carpark","meta_description":null,"meta_keywords":null,"template":"default","position":7,"available_at":"2020-05-25 09:56:00","news_category_id":null,"file":null,"content_id":159,"path":"projects-stories\/victoria-street-carpark","news_post_id":20,"related_post_id":19,"categories":[{"id":12,"image":null,"name":"News","title":null,"intro":null,"content":null,"name_id":null,"meta_description":null,"meta_keywords":null,"position":8,"active":1,"created_at":"2020-09-18 14:04:24","updated_at":"2020-10-27 09:41:23","pivot":{"news_post_id":19,"news_category_id":12}},{"id":9,"image":null,"name":"Car Parks","title":null,"intro":null,"content":null,"name_id":null,"meta_description":null,"meta_keywords":null,"position":12,"active":1,"created_at":"2020-07-28 16:23:57","updated_at":"2020-09-18 14:04:44","pivot":{"news_post_id":19,"news_category_id":9}}]},"links":{"self":"https:\/\/www.speedfloor.co.nz\/news_post\/19","collection":"https:\/\/www.speedfloor.co.nz\/news_posts","panels":"https:\/\/www.speedfloor.co.nz\/news_post\/19\/panels","attached_panels":"https:\/\/www.speedfloor.co.nz\/news_post\/19\/attached_panels","related_posts":"https:\/\/www.speedfloor.co.nz\/news_post\/19\/related_posts","categories":"https:\/\/www.speedfloor.co.nz\/news_post\/19\/categories","images":"https:\/\/www.speedfloor.co.nz\/news_post\/19\/images"},"meta":{"preview":"\/resources\/victoria-street-carpark?preview","priority":"position","priority_order":"desc","active":1,"created_at":"2020-10-16 09:56:00","updated_at":"2023-10-19 12:27:58"},"included":[],"schema":{"collectionType":"news_posts","attributes":{"import_id":{"name":"import_id","type":"int","isRequired":false,"keyType":"","length":"11","default":null},"image":{"name":"image","type":"asset","isRequired":false,"keyType":"","length":"10","default":null,"extensions":["jpeg","jpg","png","svg"],"upload_dir":null,"upload_storage":null},"image_thumbnail":{"name":"image_thumbnail","type":"asset","isRequired":false,"keyType":"","length":"10","default":null,"extensions":["jpeg","jpg","png","svg"],"upload_dir":null,"upload_storage":null},"name":{"name":"name","type":"string","isRequired":true,"keyType":"","default":"","length":"255"},"title":{"name":"title","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"author":{"name":"author","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"intro":{"name":"intro","type":"text","isRequired":false,"keyType":"","default":null},"content":{"type":"text"},"name_id":{"name":"name_id","type":"slug","isRequired":false,"keyType":"","default":"","length":"251"},"meta_description":{"name":"meta_description","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"meta_keywords":{"name":"meta_keywords","type":"string","isRequired":false,"keyType":"","default":"","length":"255"},"template":{"name":"template","type":"enum","isRequired":true,"keyType":"","default":"default","length":"255","values":[{"id":"default","name":"default","config":[]}]},"position":{"name":"position","type":"int","isRequired":false,"keyType":"MUL","length":"10","default":null},"available_at":{"name":"available_at","type":"datetime","isRequired":false,"keyType":"","default":null},"news_category_id":{"name":"news_category_id","type":"int","isRequired":false,"keyType":"","length":"11","default":null},"file":{"name":"file","type":"asset","isRequired":false,"keyType":"","length":"11","default":null,"extensions":["pdf"],"upload_dir":null,"upload_storage":null},"path":{"name":"path","type":"string"}},"relationships":{"panels":{"type":"HasMany","class":"Panel","refs":"\/panels\/_ref_"},"attached_panels":{"type":"BelongsToMany","class":"AttachedPanel","refs":"\/attached_panels\/_ref_"},"related_posts":{"type":"BelongsToMany","class":"NewsPost"},"categories":{"type":"BelongsToMany","class":"NewsCategory","refs":"\/news_categories\/_ref_"},"images":{"type":"HasMany","class":"NewsPostimage"}}}}]}},"config":{"filter":false}}